Available immediately Valid for 10 years Energy certificate under the GEG

Published on 11 min read Deutsch

Renovation & funding

KfW or BAFA? Which funding programme fits which renovation

Christine Werker

Energieberaterin (EEE) & Architektin

As of:

You have decided to renovate and immediately come across two names: KfW and BAFA. Both fund energy-efficient renovation, both belong to the Federal Funding for Efficient Buildings (Bundesförderung für effiziente Gebäude, BEG) — and yet the question “where do I apply?” is no mere formality. This article is written for owners of a residential building who are about to place their first order and want to know which application goes where.

Detached house with scaffolding and partly fitted façade insulation, a heat pump in front of it. On the left the German headline “KfW oder BAFA? Wer fördert was” (KfW or BAFA? Who funds what); a label “KfW” points to the heat pump, a label “BAFA” to the insulation, roof and windows.
Heating to the KfW, insulation and windows to the BAFA: plan both and you file two applications with two bodies.

The article first draws the map: which body funds which building element. Then the second fork in the road — individual measure or efficiency house. Then the sequence of advice, contract and application, the evidence required, the limits on combining funding and, finally, the tax route for everyone who does not want to file an application.

Who funds what — KfW or BAFA?

The division follows no administrative logic, but the building element. Everything concerning the heat generator goes through the Kreditanstalt für Wiederaufbau (KfW), the federal development bank. Everything on the building envelope and building services other than heating goes through the Federal Office for Economic Affairs and Export Control (Bundesamt für Wirtschaft und Ausfuhrkontrolle, BAFA). And the advice that precedes both is a pot of its own — also with the BAFA.

Anyone planning both therefore files two applications with two bodies, with two deadlines and two sets of evidence. This is the point at which most schedules fall apart. How a renovation fits together technically and in which order it makes sense is covered in Energy-efficient renovation and funding 2026 — here the subject is the administrative route.

Responsibility by measure, application body and form of funding
Measure Body Form
Heat pump, biomass, solar thermal, heating network connection KfW Grant (458)
Insulation of walls, roof, ceilings, floor areas BAFA Grant
Windows, external doors, external sun shading BAFA Grant
Ventilation system, heating optimisation BAFA Grant
Renovation to an efficiency house level KfW Loan with repayment grant (261)
Energy advice, individual renovation roadmap BAFA Grant towards the fee
Specialist planning and construction supervision with the respective project Grant or repayment grant

One basic rule stands above everything and is regularly overlooked: § 89 (1) no. 4 of the Building Modernisation Act (Gebäudemodernisierungsgesetz, GModG) ties the funding to the condition that the funded measure exceeds the statutory requirements.1 Anyone who merely meets the minimum of Annex 7 has complied with the Act and is still not entitled to any money. The relevant values are set out in the technical minimum requirements of the programmes, not in the Act.

Individual measure or efficiency house — what is the difference?

This is the second fork in the road, and it decides the amount of funding, the effort and the evidence.

An individual measure (Einzelmaßnahme) is exactly that: one building element, one system, one grant. You insulate the roof, replace the heating, renew the windows — each on its own, each with its own application, each with its own funding rate. The advantage is flexibility: you renovate at the pace your budget allows and do not have to prove anything beyond the individual element.

An efficiency house renovation (Effizienzhaus-Sanierung), by contrast, assesses the whole building after the measure. It calculates against a reference building, it requires overall energy planning, and it is funded not as a grant but as a low-interest loan with a repayment grant (Tilgungszuschuss) — programme 261, maximum funding amount 150,000 euros per residential unit.2 There is no longer a grant variant for this: the former programme 461 no longer accepts applications and itself refers to the loan.9 What levels 85, 70, 55 and 40 mean and which repayment grant is attached to which is covered in a separate article.

Individual measure and efficiency house renovation compared
Criterion Individual measure Efficiency house (KfW 261)
Subject one building element or system the building after renovation
Body BAFA (envelope), KfW (heating) KfW
Form of funding grant loan with repayment grant
Upper limit €30,000 assessment basis for the first residential unit €150,000 loan per residential unit
Evidence per measure overall balance of the building
Specialist expert (envelope) or specialist firm (heating) energy efficiency expert mandatory
Suits step-by-step renovation complete renovation in one go

The choice is not a matter of style but binding for years: combining the two routes is ruled out, and after completion of a project funded through the efficiency house scheme, an application for individual measures is only possible again after three years — and the same applies the other way round.2 Anyone who has an individual measure funded in the first step has therefore blocked the route to an efficiency house renovation for three years.

The assessment basis for individual measures is staggered by residential unit: 30,000 euros for the first, 15,000 euros each for the second to sixth and 8,000 euros each from the seventh. If a funded individual renovation roadmap (individueller Sanierungsfahrplan, iSFP) is in place, these limits rise to 60,000, 30,000 and 15,000 euros.4 What is capped is therefore not the grant, but the sum to which the funding rate is applied — what the renovation roadmap brings beyond that is explained in iSFP: What the individual renovation roadmap brings.

What does the advice cost — and why does it come first?

Because two of the three routes cannot be taken without it at all. For individual measures on the envelope and building services, the BAFA requires the involvement of an energy efficiency expert (Energieeffizienz-Experte) from the federal expert list;46 for the efficiency house renovation, the same expert produces the confirmation for the application, without which the KfW will not accept the application.2 Only for a heating replacement is the confirmation of the specialist firm carrying out the work sufficient.

The advice itself is funded: the federal funding for energy advice for residential buildings covers 50 per cent of the eligible fee, up to a maximum of 650 euros for one- and two-family houses and up to a maximum of 850 euros for buildings with three or more residential units.5 One of the conditions is that the building application or building notification was made at least ten years ago.

Within the efficiency house scheme there is also a separate pot for specialist planning and construction supervision: up to 10,000 euros per project for one- and two-family houses, for apartment buildings 4,000 euros per residential unit and at most 40,000 euros per project; the repayment grant on this is 50 per cent.2

In what order do you apply?

This is where the most expensive mistake in the entire funding landscape lies, and it has a name: project start (Vorhabenbeginn).

Project start (Vorhabenbeginn)

In the funding law of the Federal Funding for Efficient Buildings, project start is the conclusion of a supply or service contract attributable to the execution of the work — not the start of construction and not the first invoice. Anyone who concludes an unconditional contract with a tradesperson before applying has started the project and loses the funding for this measure entirely. A contract concluded subject to the condition precedent or condition subsequent of the funding approval does not count as project start.

Project start already means the conclusion of a supply or service contract attributable to the execution of the work — not the first turn of the spade, not the first invoice.2 Anyone who signs the contract with the tradesperson and applies afterwards has lost the funding for this measure, completely and without leniency.

The way out is a contract clause: the contract is concluded subject to the condition precedent or condition subsequent of the funding approval. Then there is no project start. For a heating replacement, a contract with such a condition is even part of the application — it is uploaded together with the confirmation.3

From the idea to the approved application

  1. Year of construction, living space, condition of the building elements and consumption over the last three years. The key figure for this is provided by the energy performance certificate.

  2. From the federal expert list, in the appropriate category — a different one for an efficiency house renovation than for individual measures, and yet another for listed buildings.

  3. Individual measures with the BAFA and the KfW, or an efficiency house renovation via loan 261. Switching afterwards costs time, not money.

  4. The contract carries the condition precedent or condition subsequent of the funding approval — otherwise the project has started and the funding is gone.

  5. Directly with the BAFA; with the KfW, for the loan, via a financing partner. What counts is receipt by the funding body.

  6. Only with the approval does the project begin without risk. Changes to the efficiency house level are still possible afterwards, but are again tied to the project start.

  7. After completion, the expert confirms compliance with the technical minimum requirements and the savings; only then does the payment or the crediting of the repayment grant follow.

What may be combined — and what may not?

Three limits, and all three are breached in practice.

First, the funding rate. If all public funds taken together — state programmes, municipal grants, other federal funds — result in a rate of more than 60 per cent for the same measure, this must be reported to the KfW; the BEG funding is then reduced so that 60 per cent is reached, and amounts already paid out must be repaid.2 Interest subsidies on funding loans and public guarantees are not counted.

Second, the same measure twice. A building element is funded once. Anyone who has the façade funded as an individual measure cannot additionally include it in the efficiency house balance of the same renovation.

Third, grant and tax reduction. § 35c (3) of the Income Tax Act (Einkommensteuergesetz) denies the tax reduction if low-interest loans or tax-free grants are claimed for the same measure.7 The KfW information sheet draws the line even more tightly: excluded for the same measure, neither at the same time nor at a later time, are the tax reduction under § 35c and the deduction for tradesperson services under § 35a (3) of the Income Tax Act — “not even as a split into material costs and labour”.2 The widespread advice to have the material share funded and deduct the labour share for tax therefore does not hold. You decide per measure — not per building and not per year.

Also ruled out is claiming, for the same costs, the programmes “Altersgerecht Umbauen” (age-appropriate conversion, 159), “Barrierereduzierung” (barrier reduction, 455-B) and “Einbruchschutz” (burglary protection, 455-E) at the same time.2 Anyone making the home barrier-free in the same go separates the invoices cleanly by trade — otherwise one of the two funding streams falls away.

Two applications for one house: roof and heat pump

A detached house, built in 1968. Planned are the insulation of the roof and the replacement of the 22-year-old gas heating with a heat pump.

Roof: application to the BAFA, individual measure on the building envelope, energy efficiency expert mandatory.

Heat pump: application to the KfW, heating subsidy 458, confirmation from the specialist firm is sufficient.

Both applications must be filed before the respective project start — and both contracts carry the funding clause. Above both stands the cumulation limit of 60 per cent of the funded costs from public funds.

Result two procedures, two bodies, one common upper limit

What applies to apartment buildings and owners’ associations?

Besides private individuals, companies, sole traders, partnerships, legal entities under private law and housing cooperatives are also eligible to apply.2 A special rule applies to owners’ associations (Wohnungseigentümergemeinschaften): measures on common property are applied for by the association, measures on separate property by the individual owner. The dividing line is the same as in the law on residential property — the façade belongs to everyone, the inside of the flat’s front door not necessarily.

Two points regularly cause delays at owners’ meetings. First: the assessment limits for individual measures count per residential unit, not per building — a house with eight flats therefore reaches a considerably higher assessment basis than eight terraced houses with one each. Second: the resolution must be passed before the contract is concluded, and the application must be submitted before the contract. Anyone who chooses the order resolution – contract – application has lost the funding.

If the applicant is not the owner of the building — a leaseholder or a holder of a heritable building right, for example — they are only eligible if the owner is also eligible and was informed before the application about the use of the funding and the amount of the maximum funding.2

Why the energy performance certificate counts for a lot in this constellation: it is issued for the building, not for the individual flat — and thus becomes the common basis of figures for the whole association. The details are covered in Energy performance certificate for an owner-occupied flat.

What if you do not want to file an application at all?

Then the tax route remains. For energy-related measures on an owner-occupied building that is more than ten years old when the work is carried out, income tax is reduced in the year of completion and in the following year by 7 per cent of the expenditure each, at most 14,000 euros each, and in the third year by 6 per cent, at most 12,000 euros; for the costs of an energy consultant it is 50 per cent.7

The route has three advantages: no application before the contract, no deadline, no expert as an obligation. It has three disadvantages: it applies only to owner-occupiers, it requires a certificate from the specialist firm and cashless payment, and it is spread over three years. And it is time-limited — eligible are measures completed before 1 January 2030.

For landlords it is not an option; for them, energy-related expenditure is maintenance or production cost, and the distinction belongs in the tax return, not in a funding application. What the energy performance certificate itself means for tax purposes is covered in Is the energy performance certificate tax-deductible?.

Frequently asked questions about KfW and BAFA

What owners most often ask about choosing a programme

Do I have to file two applications if I do the heating and the insulation together?

Yes. The heat generator goes through the KfW, the building envelope through the BAFA — two bodies, two applications, two sets of evidence. Only someone who brings the building up to an efficiency house level has a single procedure with the KfW.

From when is a project considered to have started?

With the conclusion of a supply or service contract attributable to the execution of the work. Not with the start of construction. Anyone who makes the contract subject to the condition precedent or condition subsequent of the funding approval has not yet started.

Do I need an energy efficiency expert for every type of funding?

For individual measures on the envelope and building services and for an efficiency house renovation, yes. For a heating replacement via the KfW, the confirmation of the specialist firm carrying out the work is sufficient.

Can I combine state funding and BEG?

In principle yes, but the total from all public funds may not exceed 60 per cent of the funded costs. If the limit is exceeded, this must be reported and the BEG funding is reduced.

Which is better value — grant or tax reduction?

As a rule the grant, because it takes effect immediately and is also open to landlords. The tax reduction is worthwhile above all if the application was missed or the effort is to be avoided — the two cannot be combined for the same measure.

Conclusion: clarify the body first, then sign the contract

The map is simpler than it looks: heating to the KfW, envelope and building services to the BAFA, the whole house via loan 261 — and the advice beforehand is funded by the BAFA. The difficulty is not the allocation but the sequence: every application has to be submitted before the project starts, and the project starts with the unconditional contract with the tradesperson. Anyone who writes this one clause into every quote has avoided the most common and most expensive mistake in funding practice.

Sources

  1. Building Modernisation Act (GModG), § 89 — Financial support (version 09/2026) gesetze-im-internet.de ↩
  2. KfW — Information sheet loan no. 261, BEG residential buildings loan efficiency house, valid from 21 July 2026 (as of 07/2026) kfw.de ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12 ↩13
  3. KfW — Information sheet grant no. 458, heating subsidy for private individuals, valid from 21 July 2026 (as of 07/2026) kfw.de ↩
  4. BAFA — Federal Funding for Efficient Buildings, individual measures on the building envelope (as of 07/2026) bafa.de ↩1 ↩2 ↩3
  5. BAFA — Federal funding for energy advice for residential buildings (as of 04/2026) bafa.de ↩1 ↩2
  6. Energy efficiency expert list for federal funding programmes (retrieved 09/2026) energie-effizienz-experten.de ↩
  7. Income Tax Act (Einkommensteuergesetz), § 35c — Tax reduction for energy-related measures on buildings used for one's own residential purposes (version 09/2026) gesetze-im-internet.de ↩1 ↩2
  8. Federal GEG information portal (BBSR) — New rules under the Building Modernisation Act (GModG) (as of 08/2026) gmodg.bund.de
  9. KfW — Federal Funding for Efficient Buildings, residential buildings grant (461): “You can no longer apply for this grant” (retrieved 13 September 2026) kfw.de ↩
  10. BMWE — Guideline for the Federal Funding for Efficient Buildings, residential buildings (BEG WG), version of 20 July 2026, including the annex on technical minimum requirements energiewechsel.de

This article reflects the position at the time of publication and does not replace legal or energy advice in an individual case. Binding are the Building Modernisation Act (Gebäudemodernisierungsgesetz, GModG) in its applicable version and the details in the issued energy performance certificate.